Board price is dominated by laminate consumption and process steps, not by layer count alone. Three levers move it more than most buyers expect.

1. Panel utilisation

A 105 × 85 mm board on our 610 × 1100 mm panel wastes less material than a 110 × 90 mm one, because the panel arithmetic changes — how many boards fit per row, and how many rows fit at all. On small boards this alone can move unit price by 20–30%. The practical move: send the outline early and ask what the best panelisation would be, before the layout is frozen. Rotating a design 90°, allowing a shared tooling strip, or accepting a slightly different outline can all change the price without changing the board.

2. Standardise what does not matter

Green mask ships fastest; exotic thicknesses and non-stocked copper weights add process steps. Every "special" that survives into the spec should have a reason. The stocked grades — standard FR-4, high-Tg, halogen-free, the common RF laminates — exist precisely because running them is routine. An unstocked laminate turns a quick-turn into a procurement wait even before price is discussed.

3. Quantity breaks are real but not linear

The unit-price curve drops steeply from 1 to 100 pieces, then flattens. Setup and tooling are charged per order, not per piece — so if 60 pieces covers the year, ordering 60 beats ordering 30 twice: one setup charge, one tooling charge, one shipment. The corollary: buying a year's worth to "get the price" only works if the design is stable. A revision turns that inventory into scrap.

Try it with numbers

The instant quote shows a live price band as you change size, quantity, layer count and options — with the factors that produced it, so you can see which lever is actually moving the price before committing a layout. Two minutes with the outline and a quantity is usually enough to find the 20% case.

Questions we get about this

How much can panelisation change my price?
On small boards, 20–30% of unit price is realistic — it depends on how many boards fit per panel row. Sending the outline early lets us check the arithmetic before layout freezes.
Why is ordering 60 once cheaper than 30 twice?
Setup and tooling are charged per order. One order of 60 pays them once; two orders of 30 pay them twice, on top of two shipments.
Does a non-green solder mask really cost more?
Colours beyond green and the common mattes are produced less often, which can add process or minimum-order constraints. If colour does not matter to the product, keep the default.